Power Development Plan new draft

It is reported that a new draft PDP has been submitted by MOIT.  The reported 2030 goal for renewable is double of the 2021 installed capacity reach about 140GW, or accounting for 27% of the total installed capacity.  No nuclear is reportedly mentioned.